Question 1: Consider the following Network, figures in the boxes are the durations. Determine
  1. (a) The earliest expected completion time for each period,
  2. (b) The latest allowable event completion time for each event
  3. (c) The slack time (all floats) for each event
  4. (d) The Critical Path through the Network