To accept the potential risk and continue operating the IT system or to implement controls to lower the risk to an acceptable level is called as __________.
This multiple choice question (MCQ) is related to the book/course vu cs507 Information Systems. It can also be found in vu cs507 Final Term - Quiz No.6.
To accept the potential risk and continue operating the IT system or to implement controls to lower the risk to an acceptable level is called as __________.
Risk Planning
Risk Assumption
Risk Limitation
None of the above